The project consists of 16,000 ton of very heavy structural steel with mainly welded connections.
Louvre Museum Abu Dhabi

A most iconic and unique dome structure which consists of 7000 ton dome and 4000 ton of temporary
Dubai Airport Terminal 2

The Dubai Airport Terminal 2 extension consisting of 2000 ton of rafters and columns.
Talex

Located on the border of Dubai the huge warehouse consists of 5000 ton of rafters, columns and crane beams.
Aldar HQ Entrance Canopy

An extremely complicated canopy structure with minimal tolerances to accommodate the complex cladding panels.
Dubai International Airport Concourse 4 Facade

Architectural steelwork installed to very small tolerances to allow for the glass facade.
Dubai International Airport Terminal 2 Expansion

The impressive airport extension installed in complicated conditions and program.
Dubai Mall Link Bridge

A iconic project changing the landscape of Downtown Dubai, the project was completed with incredible planning and logistics not to disrupt the busy mall and area.
GSEM Building Dubai International Airport

A 2000 ton structure consisting of 50 meter truss
JBR Hilton Hotel Link Bridge

The 100 ton link bridge was installed during the night using a 500 ton crane in the busy JBR avenue.
Maktoum Airport Passenger Terminal

The new Al Maktoum airport consisting of 5000 ton of heavy truss and rafters.
Nation Towers Abu Dhabi

Various structures totalling 2000 ton including the impressive wave shopping mall.
Sheihk Kaliffa Mosque Abu Dhabi

An extremely complicated structure involving considerable planning and temporary supports which completed a very impressive roof structure.
Sheihk Kallifa Palace Al Ruwais

A project of various buildings , total 3500 ton which mainly consisted of heavy truss , with the maximum one truss being 150 ton which was installed using two 500 ton cranes.
Weldtech Facilities Workshop

The project consisted of 1500 ton of rafters and columns, the 35 meter high structure was completed on program.
Yas Island Water Park

The complicated project consisted of 2000 ton of feature steel work, the coordination and logistics of this project was monitored by our team to ensure the planned open date.